Before & After

Drag the handle. Watch it disappear.

Seven rooms, photographed in the middle of the job and again at hand-off. Same space, days apart. Pair with the finished-work gallery if you want to skip ahead to the after.

01 · Coffered ceiling build

From boarded frame to finished floor.

Four-stage project photographed through hang, tape, mud and hand-off. Same room, same angle.

Finished coffered-ceiling room with hardwood floor and clean white walls. 01 · Boarded & ready 04 · Finished & floored
Coffered ceiling · Victoria, BC New build · Level 4 finish
Mid-taping: mud lines visible on the ceiling, tools on the floor.
Stage 2 · Taped
Mud coats drying on ceiling and walls, ladder in place.
Stage 3 · Mudded
02 · Arched-window room

Taped seams to a clean Level 4.

Heritage arched window, long rooflines, and a ceiling with a lot of joints — all flat under the lamp.

Finished hallway with arched window and recessed lighting. 01 · Taped & mudded 02 · Finished
Arched-window hall · Rockland, BC Renovation · Level 4 finish
03 · Commercial build-out

A pod of offices, handed off clean.

Interior walls framed inside an industrial shell — crisp corners under the exposed ceiling.

Finished interior office pod inside a warehouse, clean white walls. 01 · Mudded 02 · Handed off
Office pod · Langford, BC Commercial · Level 4 finish
04 · Fireplace room

High ceilings, long sight lines.

Tall wall next to a double patio door — the kind of expanse where a small seam becomes a big problem.

Finished living area with fireplace, floor-to-ceiling windows and patio doors. 01 · Taped 02 · Finished
Fireplace room · Fernwood, BC New build · Level 4 finish
05 · Bright back room

Seams gone. Wall quiet.

Tall south-facing window — unforgiving light. The kind of wall that needs a skim if the taping isn't perfect.

Finished back room with a tall window on the left and concrete floor. 01 · Mid-finish 02 · Handed off
Back room · Saanich, BC New build · Level 4 finish
06 · Coffered ceiling, reveal

From boarded frame to finished floor.

The same coffered-ceiling build as the opener, shown end-to-end — raw board on the left, hand-off on the right.

The same room at hand-off — finished coffered ceiling, hardwood floor, clean white walls. 01 · Boarded 04 · Finished
Coffered ceiling · Victoria, BC New build · Level 4 finish
07 · Snowline residence

Paint-ready, move-in clean.

Same room. Same light. One is freshly taped and mudded — the other is painted and ready to live in.

Snowline residence after finishing and paint. 01 · Taped & mudded 02 · Painted & finished
Snowline residence · Saanich, BC New build · Level 4 finish

Browse the finished-work gallery, or tell me about your project.